Kibing Sand Plant

NEW DEVELOPMENT OF ELECTRICAL SUBSTATION 132/33KV SSU, SENAWANG, NEGERI SEMBILAN CLIENT Kibing Group (M) Sdn Bhd TOTAL EST. PROJECT COST RM 18 Million PROJECT DETAILS Kibing Group is proposing to develop a SSU on Lot 635 at Senawang Industrialization area, Senawang. This will serve an important supply to the utilization

Read More

Biocare Pharma Plant

PROPSED 1 UNIT PHARMA FACTORY 2 STOREY, 1 UNIT GUARD HOUSE, 1 UNIT SSU TNB ON LOT 175, 176, 178 AND 269, INDUSTRY AREA, BANDAR BARU SERI ISKANDAR, MUKIM BOTA, DAERAH PERAK TENGAH, PERAK DARUL RIDZUAN. CLIENT Biocare Manufacturing (M) Sdn Bhd TOTAL EST. PROJECT COST RM 15 Million PROJECT

Read More

Pengerang Deepwater Terminal 2

PENGERANG DEEPWATER TERMINAL 2 AT PENGERANG, JOHOR DARUL TA’ZIM CLIENT Pengerang Terminals (TWO) Sdn Bhd TOTAL EST. PROJECT COST RM 500 Million PROJECT DETAILS Pengerang Terminals (TWO) Sdn Bhd is proposing to develop the area that consists of administration building, workshop, guard house and 64 nos of terminal tank. Pengerang

Read More

Terengganu Silica

CADANGAN MELOMBONG DAN MEMBINA KILANG BENIFIKASI SILIKA DI ATAS LOT 72017 DAN 72124 DI MUKIM CALUK, SETIU, TERENGGANU CLIENT Terengganu Silica Consortium (TSC) TOTAL EST. PROJECT COST RM 120 million PROJECT DETAILS TSC was awarded a silica mining concession for the area estimated 1000 hectares by the Terengganu State Government

Read More

Temple Hall Puchong

PROPOSED CONSTRUCTION OF A TEMPLE HALL AT BATU 14, JALAN PUCHONG, SELANGOR CLIENT PERSATUAN PENGANUT SRI MAHA MARIAMMAN, PUCHONG, SELANGOR TOTAL EST. PROJECT COST RM 6 Million PROJECT DETAILS Temple Committee proposed to develop a Multipurpose Hall on the temple’s land. This will serve an important part in carrying out

Read More

Pengerang Fabrication Facilities

PROPOSED DIALOG FABRICATORS PENGERANG FACILITY AT PENGERANG, JOHOR DARUL TAKZIM CLIENT Dialog Fabricators Sdn Bhd TOTAL EST. PROJECT COST RM 16 million PROJECT DETAILS Dialog Fabricators Sdn Bhd (DFSB) is proposing to develop the fabrication yard located at Tanjung Pengerang, southern part of Johor. DFSB appointed VSP as the civil

Read More

Transgrid South Key PMU, JB

DEVELOPMENT OF PMU 132/33KV SOUTH KEY JB GIS (2X90MVA), JOHOR CLIENT: Tenaga Nasional Berhad TOTAL EST. PROJECT COST RM 43 million PROJECT DETAILS TNB proposed to develop a PMU on Lot PTD213111 in Mukim Plentong, Johor Bahru. This will serve as an important power supply to the utilization of electricity.

Read More

Labis Shoplots

CADANGAN BANGUNAN DI BAWAH AKTA 133 BAGI KEDAI PEJABAT YANG MENGANDUNGI: (1) FASA 1 (a) 26 UNIT KEDAI PEJABAT 2 TINGKAT (22’ X 91’) – JENIS A (b) 13 UNIT KEDAI PEJABAT 3 TINGKAT (22’ X 91’) – JENIS B (2) FASA 2 (a) 26 UNIT KEDAI PEJABAT 2 TINGKAT

Read More

Vale Lumut (Structural)

STACKER/RECLAIMER FOUNDATION SYSTEM AT VALE MALAYSIA, MANJUNG, PERAK CLIENT VALE MA SDN BHD TOTAL PROJECT COST (ESTIMATED) RM 100 million PROJECT DETAILS The project was awarded to Keller (M) Sdn Bhd under Design and Build contract for the construction of new Stacker/Reclaimer Foundation System for the Iron Ore Storage Facility.

Read More

Top Glove Lot 4948

PROPOSED CONSTRUCTION OF NEW FACTORY AT LOT 4948, AT MUKIM KAPAR DAERAH KLANG, SELANGOR CLIENT TOP QUALITY GLOVE SDN BHD TOTAL EST. PROJECT COST RM12 million PROJECT DETAILS Top Quality Glove Sdn Bhd is proposing to develop a new rubber glove manufacturing factory. GCU as the architectural, civil, structure and

Read More
  • 1
  • 2