NEW DEVELOPMENT OF ELECTRICAL SUBSTATION 132/33KV SSU, SENAWANG, NEGERI SEMBILAN
CLIENT Kibing Group (M) Sdn Bhd
TOTAL EST. PROJECT COST RM 18 Million
PROJECT DETAILS
Kibing Group is proposing to develop a SSU on Lot 635 at Senawang Industrialization area, Senawang. This will serve an important supply to the utilization of the industrial electricity. GCU was appointed as the architect, geotechnical, civil & structural, mechanical & electrical consultant for the proposed development.
SCOPE OF WORKS
The scope of architectural & civil consultancy services provided include:-
- Planning and development of the architectural drawings.
- Planning and design of the infrastructure works including earthworks, drainage, water supply and sewerage.
- Preparation of submission drawings reports to obtain approval from local authorities, SAJ, JKR, JPS, PPSPPA and IWK.
- Design and development of all structural elements including rc- piles, pad footings and pilecaps, beams, slabs, columns and proof walls for substation units.
- Detail design of miscellaneous structures to support equipment
- Design & technical support during construction and CCC.