CADANGAN BANGUNAN DI BAWAH AKTA 133 BAGI KEDAI PEJABAT YANG MENGANDUNGI:

(1) FASA 1
(a) 26 UNIT KEDAI PEJABAT 2 TINGKAT (22’ X 91’) – JENIS A
(b) 13 UNIT KEDAI PEJABAT 3 TINGKAT (22’ X 91’) – JENIS B

(2) FASA 2
(a) 26 UNIT KEDAI PEJABAT 2 TINGKAT (22’ X 91’) – JENIS A
(b) 13 UNIT KEDAI PEJABAT 3 TINGKAT (22’ X 91’) – JENIS B

DI ATAS LOT 129, G.132740, MUKIM BANDAR LABIS, DAERAH SEGAMAT, JOHOR DARUL TAKZIM

CLIENT SUNGAI KARAS DEVELOPMENT SDN BHD
TOTAL PROJECT COST (ESTIMATED)RM 20 million

PROJECT DETAILS

Sungai Karas Development Sdn Bhd developed shop offices in Labis, Segamat. The development consists of two phases consisting of 52 units of 2-storey shop offices and 26 units of 3-storey. VSP was appointed as the Civil & Structural Consultant for this project.

SCOPE OF WORKS

  • Planning and design of the earthwork, surface drainage in accordance to MASMA guidelines.
  • Planning and design of proposed road network (profile and geometric) serving each lots and other amenities within the development including provision acceleration and deceleration lane at the main entrance road.
  • Planning and design of overall water reticulation system and sewerage network.
  • Preparation of submission drawings / reports to obtain approval from local authorities, SAJ, JKR, JPS and IWK.
  • Design and development for all structural elements including pile foundation, beams, slabs, and column and shear walls for factory units.
  • Design & Technical support during construction and CCC.