DESIGN, SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF NPE INTERCHANGE FOR CADANGAN PECAHAN SEMPADAN BAGI PEMBANGUNAN BERCAMPUR YANG MENGANDUNGI KEDIAMAN, PERNIAGAAN DAN KEMUDAHAN AWAM DI ATAS TANAH MILIK DEWAN BANDARAYA KUALA LUMPUR (DBKL), (NO. PT TERDAHULU 2969, 2970 DAN 1602, BUKIT KERINCHI, JALAN PANTAI DALAM, WILAYAH PERSEKUTUAN KUALA LUMPUR

CLIENT: IJM CONSTRUCTION SDN BHD
TOTAL EST. PROJECT COST RM 52 million

PROJECT DETAILS

This project was to proposed access to new development where is Pantai Sentral Park (PSP) under AMONA Group Berhad.
The access was designed and proposed by GCU consist of four at grade and three elevated ramp which is for the entry and exit ramp from New Pantai Expressway (NPE) and slip road from existing Jalan Pantai Dalam to proposed development area.

SCOPE OF WORK

The scope of work required in order to accomplish the task as stipulated in the letter of appointment is as stated below:-

  • To carry out design of interchange inclusive of horizontal & vertical alignment, road structure (pavement & bridges), drainage work, road marking and signages
  • Design of substructure and superstructure of bridge ramps
  • Design of RS Wall embankment
  • Design of bridge foundation