CADANGAN MEMIBINA BANGUNAN 2 TINGKAT PENCAWANG MASUK UTAMA 275kV (SERDANG EAST SWITCHING STATION) DI ATAS SEBAHAGIAN LOT PT 9170, PRESINT 11, PUTRAJAYA

CLIENT: TNB/Transgrid Resources Sdn Bhd
TOTAL EST. PROJECT COST RM 22 Million

PROJECT DETAILS

TNB proposed to develop a 275kV PMU switching station on Lot PT9170 in Presint 11, Putrajaya. This switching station (switchyard) is built to function as a collector and distributor of power supply to local substations. GCU was appointed as the architect, geotechnical, civil & structural consultant for the proposed development.

SCOPE OF WORKS

The scope of architectural & civil consultancy services provided include:-

  • Planning and development of the architectural drawings.
  • Planning and design of the earthwork platform levels for cut and fill analysis, silt traps and temporary earth drains during construction.
  • Planning and design of all civil infrastructure works including sewerage, water supply, road and drainage.
  • Preparation of submission drawings / reports to obtain approval from local authorities, SAJ, JKR, JPS, PPSPPA and IWK
  • Design and development of all structural elements including rc-pile, pad footing and raft foundations, beams, slabs, column and shear walls for substation units
  • Design & technical support during construction and CCC