CADANGAN MEMBINA SEBUAH STESEN JANAKUASA ELEKTRIK TURBIN GAS KITAR PADU BERKAPASITI 1800MW HINGGA 2400MW DI ATAS HAKMILIK TANAH PN 56571 LOT 14803, MUKIM KUALA SUNGEI BARU & PN 56539 LOT 20263, MUKIM SUNGEI BARU ILIR, DAERAH ALOR GAJAH, MELAKA
CLIENT HYUNDAI ENGINEERING MALAYSIA SDN. BHD.
TOTAL PROJECT AREA 100 Acre
TOTAL EST. PROJECT COST
Overall cost: RM 2.4 billion Earthwork cost: RM 18.7 million
PROJECT DETAILS
Edra Energy Sdn. Bhd. has awarded Hyundai Engineering Malaysia as the Engineering, Procurement, Construction and Commissioning (EPCC) for the proposed 1800 MW to 2400 MW Power Plant at Alor Gajah, Melaka. Hyundai Engineering Malaysia has appointed GCU Consultants (C&S) Sdn. Bhd. as the project consultants for the scope of Earthwork, Geotechnical and ESCP.
SCOPE OF WORKS
The scope of consultancy services provided include: –
- To carry out design of earthwork and platforming.
- To carry out design of Erosion and Sediment Control Plan
- To carry out design of geotechnical work for slope stability and settlement
- To obtain local authorities approval
- Supervising and monitoring