CADANGAN MEMBINA AIR SEPARATIONS UNITS DI ATAS SEBAHAGIAN PTD 5319 PLOT 137, PROJEK BERSEPADU LOJI PENAPISAN MINYAK DAN PETROKIMIA RAPID, MUKIM PENGERANG, DAERAH KOTA TINGGI, JOHOR DARUL TA’ZIM.
CLIENT LINDE ENGINEERING MALAYSIA SDN BHD
TOTAL EST. PROJECT COST RM100 million
PROJECT DETAILS
LINDE ENGINEERING Sdn Bhd is proposing to develop the Air Separations Units located at Tanjung Pengerang, southern part of Johor. LINDE appointed GCU as the civil, structure, geotechnical, Mechanical & Electrical Consultant for this project responsible for all civil and structural elements.
SCOPE OF WORKS
The scope of civil consultancy services provided include:-
- Design review of the building, electrical instruments steel structure and foundation.
- Preparation of all infra drawings including submission to local authority.
- Preparation of architectural drawings including submission to local authority.
- Preparation of M&E drawings including submission to local authority.
- Preparation of the construction drawings.
- Design support during construction
- Obtain CCC for the project
- Planning and design of overall water reticulation system.
- Planning and design sewerage network for proposed development.