CADANGAN TAMBAHAN DAN PERUBAHAN SERTA MENAIKTARAF BANGUNAN STADIUM NATIONAL DAN STADIUM PUTRA SEDIADA DAN KANOPI PEJALAN KAKI DI KOMPLEKS SUKAN NEGARA BUKIT JALIL DI ATAS SEBAHAGIAN LOT PT 2875, BUKIT JALIL, MUKIM PETALING, DALAM BANDARAYA KUALA LUMPUR UNTUK TETUAN PERBADANAN STADIUM MALAYSIA.
CLIENT RUKUN JUANG/MRCB
TOTAL EST. PROJECT COST RM150 Million
PROJECT DETAILS
The design was carried out by HSSI to incorporate new structures/elements to each stadium. GCU Consultants (C&S) Sdn Bhd was appointed by Rukun Juang Sdn Bhd as peer review consultants to carry out independent checking for the proposed upgrading works of National Stadium, Putra Stadium, Aquatic Stadium and Infra/Plaza.
SCOPE OF WORKS
The scope of work as a Peer Review Consultants for the stadiums include various extension design of National stadium, VIP Foyer, Royal Lounge, Corporate box, Putra stadium, Aquatic stadium and Infrastructure works. The Scope of works includes:
- Design check of the proposed RC structures, foundation and retaining walls as well as PT beams
- Design check of the enlarged beam/new beam for the proposed escalator and lift.
- Design check of the proposed steel staircase and connections.
- Design check of the proposed corporate box, corbels and connections.
- Design check of the proposed roof truss.
- Design check of the proposed smoke spill support.
- Design check of the proposed diving platform
- Design check of the proposed infrastructure designs